Main Gas Pipeline
The contracting authority is Bulgartransgaz EAD – Sofia.
The scope includes reinforcing the river banks and bed with gabions; construction of a new concrete hydraulic sill, stilling basin and bottom sill; construction of a protective structure at PK 422 of the Main Gas Pipeline and its optical and communication cable at the Gabra River crossing, Bogdanliya, Elin Pelin Municipality.

