Samuilovo Dam

Construction of an earth-fill dam wall, a main outlet – DN 800 mm, 195 m long, intake and gate chambers, a pressure pipeline to the Petrich main irrigation canal with DN 500 mm pipes, 634 m long, and an outlet chamber, a service building, potable water supply and sewerage, asphalt service roads, drainage ditches, culverts and a spillway.

Other projects